Flora Gardens Primary School
Project: |
Development of phased plan new-build |
Status: |
Ongoing |
Location: |
Dalling Road, W6 0UD |
Client: |
London Borough of Hammersmith & Fulham |
Contract Value: |
£5.5m approx |
This project explores the opportunities for transforming the Flora Gardens Primary School and increasing the school’s capacity from 1FE to 2FE plus Nurseries. Flora Gardens Primary School is a community primary school with currently 232 pupils on the school role. The ages range from 3 to 11 years. The space requirements are based on the Department for Education (DfE) guidelines
Building Bulletin No 99
Briefing Framework for Primary School Projects, Incorporating primary school revision to BB82: Area Guidelines for Schools (BB99). The feasibility study for enlargement:
• identified three options to suit the vision of the school community;
• included a spatial analysis of the existing and proposed facilities;
• highlighted the constraints affecting the realisation of the client’s brief;
• included a structural appraisal of the existing buildings and made initial recommendations on the technical viability of the proposed works;
• included a cost analysis of the proposed three options;
• included an assessment of the existing building services and an initial building services proposal.
http://webfronter.com/lbhf/floragardens/
Quantity Surveyor:
Thomas English Partnership
Building Services Consultants:
Halcrow
Key Services:
Brief Writing, Construction Techniques, Design for the Disabled, Full Architectural Service, Planning Advice
|